MD Fitout Case Studies

Liscard Business Centre

MDfitout Ltd are members of BNI (Business Networking International) and were contacted by Liscard Business Centre in Wallasey for their expert advice.

Liscard Business Centre asked for a quote to soundproof a wall. This would allow them to transform one large office space into two, raising the revenue of the premises.

A site visit allowed us to explain the different types off soundproof board available and explain why we recommended using specific Soundshield plasterboard as opposed to a normal standard wall board.

We double boarded the stud partitioning and included acoustic insulation. We then sealed with acoustic mastic.

Our client was very impressed with our product knowledge and our professional approach and completely satisfied with our work.

 

The Chimneys Hotel Hooton

The directors of MDfitout Ltd attended a networking event at the Chimneys in Hooton, Wirral.

One of the contacts we made was the Director of Specs2u. After a brief conversation about each other’s businesses, he said he would bare us in mind for future reference and we exchanged business cards.

The very next day he called us, as their unit in Widnes needed converting from an industrial unit into an office.

On the site visit, our team advised that installing a suspended ceiling would dramatically reduce energy bills.

At our post job update, I was informed the girls in the office were to only happier but considerably warmer.

Another satisfied customer.

IMAGE-Place-Holder

 

Avilio Health Treatement

MDfitout Ltd received an enquiry from the manager of Aivilo health treatment to fix various suspended ceilings in their establishment. One of our design team arranged an appointment to discuss their requirements in full and assess the damage on site, building a clear picture of the task ahead.

The damage was minimal – just a few missing components and tiles. We gave honest, professional advice and informed them that the job could be done without any disruption to the workplace. Our quote was immediately accepted and the work to re-instate the ceilings was carried out and completed.

IMAGE-Place-Holder

 

Devonshire Park Primary School Wirral

MDfitout Ltd responded to a call out to repair a severely damaged and unsafe suspended ceiling in Devonshire Park Primary School on the Wirral. Due to the height and nature of the ceiling repair the project became slightly more difficult than first anticipated.

The expert knowledge and problem solving capabilities allowed the MDfitout team to complete a day ahead of schedule, allowing extra time for the school caretaker to prep the classroom.

IMAGE-Place-Holder


St Cecilia’s Junior School in Tuebrook Liverpool

MDfitout Ltd services were required at St Cecilia’s Junior School in Tuebrook Liverpool.

This was a particularly arduous task; not only was the partitioning wall approx 4m from floor level on one side, the team also had to engineer around the metal staircase. The experience and expert knowledge was applied and our team created a safer environment for the pupils. A single metal barrier was replaced by a much more suitable, full height solid partition.

IMAGE-Place-Holder